PERHITUNGAN BALOK
Property Data
  
b = 100 mm
h = 160 mm
d' = 30 mm
d = 130 mm
fc' = 24.9 MPa
fy tul= 400 MPa
Es = 200000 MPa
β = 0.8
f = 0.8
M terbesar = 6000000 Nmm
Tulangan sisi bawah Tulangan sisi atas
dia = 10 mm dia = 10 mm
n = 2 buah n = 2 buah
As = 157.14 mm2 As' = 157.14 mm2
Solusi:
¤ Semua merupakan tulangan tarik
Tinggi blok tekan
a = ((As + As').fy)/(0,85.fc'.b)
 = 59.40 mm
c = a / β1
 = 74.25 mm
c > d' Tulangan Atas Tekan dan bawah Tarik
Kontrol apakah tulangan sudah leleh:
ey = fy / Es
 = 0.002
¤ Tulangan Bawah
ec = 0.003
es = 0,003 ((d-c)/c)
 = 0.0023 > ey = 0.002 Tulangan sudah leleh
¤ Tulangan Atas
ec = 0.003
es = 0,003 ((d'-c)/c)
 = -0.0018 < ey = 0.0020 Tulangan belum leleh

¤ Perhitungan Momen Kapasitas
Ts1 = As . fy
 = 62857.14 N
Ts2 = As' . fy
 = 62857.14 N
Cc = Ts1 + Ts2
 = 125714.29 N
z1 = d - (0,5a) z2 = d' - (0,5a)
 = 100.30 mm  = 0.30 mm
¤ Momen kapasitas dari tulangan bawah
Mn1 = Ts1 x z1
 = 6304657.77 Nmm
¤ Momen kapasitas dari tulangan atas
Mn2 = Ts2 x z2
 = 18943.481 Nmm
Kapasitas Momen Totalnya adalah
Mtot = Mn1 + Mn2
 =      6,323,601 Nmm > M terbesar =      6,000,000 Nmm

Tulangan Mampu menahan beban yang bekerja

SEMOGA BERMANFAAT...